Packaging Tenders: How to Run One Without Buying on Price Alone

12 min read 22 Nov 2026 WSUK Team
Procurement team at a table reviewing corrugated carton samples, a roll of packing tape and stretch film alongside printed tender documents and a specification sheet
The quick answer

A packaging tender works when the specification is fixed before suppliers price it, and bids are scored on delivered cost, damage risk, continuity and service rather than unit price. Use an RFI to shortlist, an RFQ for defined lines and an RFP where suppliers propose the solution, then sample and trial before award.

Most packaging tenders are decided before the first bid comes back. A clear specification pack produces bids that compare line by line; a vague one produces unit prices for slightly different products, and the lowest number wins by default. What follows covers the documents, the pack, the lots, the scoring and the handover.

RFI, RFQ and RFP: which document does which job

The three terms are used loosely, but they ask suppliers for different things, and sending the wrong one wastes a round.

DocumentWhat you are askingUse it whenWhat comes back
RFI (request for information)Who can supply this, and how?You do not know the supply market well, or need a shortlistCapability, ranges, service model, lead times; no binding price
RFQ (request for quotation)Price this defined specificationEvery line is fully specified, such as stock cartons, tape and stretch filmItemised prices per line, pack and pallet quantities, delivery terms
RFP (request for proposal)Propose how you would meet this requirementThe answer is open: a damage problem, a printed retail outer, a stockholding modelA proposed specification, method and price, each to be evaluated

Many tenders combine them: an RFI to shortlist, an RFQ for commodity lines and an RFP where you want the supplier's specification judgement, such as a printed shelf-ready outer or a heavy export case. Score them separately. An RFQ compares prices for the same thing; an RFP compares different solutions, so price alone cannot decide it.

Public bodies must also follow public procurement rules on advertising, timescales and how awards are made and recorded; in England, the Procurement Act 2023 came into force on 24 February 2025. Those rules sit on top of everything below: a compliant process can still buy the wrong box if the specification is weak.

Building the specification pack

The specification pack decides the quality of every bid. Two suppliers reading it should quote the same product without phoning to ask what you meant. It needs six things.

  • A line list. Every line in scope, with your code, description and the SKUs it serves.
  • Usage. Annual and monthly quantities by line, peaks marked. A steady monthly call-off prices differently from the same volume bought in one go.
  • Dimensions. Internal carton dimensions in millimetres, length x width x depth, plus the size and weight of the product inside.
  • Grades. Wall, flute and liner grade for board, such as C flute single wall or BC flute double wall; box style; tape by construction and thickness, such as 28 or 38 micron polypropylene; film by gauge and hand or machine application; foam by type and density, not thickness.
  • Samples and history. The current pack, filled where possible, with damage rates and photographs of the failures you want to stop.
  • Delivery profile. Sites, frequency, drop size, unloading restrictions, booking-in windows, pallet type and any need for stock held on call-off.

If lines are bought by product name rather than grade, write the grades down before the tender; a written material list against SKU groups, the basis of how packaging materials are specified, is what the tender rests on. A lighter grade is worth hearing, as a declared alternative priced beside the compliant bid, never as a quiet substitution.

Splitting the tender into lots

One lot for the whole category favours the largest bidder and hides a weak line inside a good total. Lots by material family let specialists bid where they are strong: stock cartons; bespoke and printed cartons; tapes; films; paper and void fill; foam and fitments; strapping and edge protection.

Two rules matter more than the split. If bidders may combine lots, require each lot priced separately too, so a bundle discount cannot mask one expensive family. And test dependent lines together. Tape lifting off recycled or dusty board is fixed by vinyl or gummed tape, not a longer strip of the same tape, and a fitment depends on its carton. Tested apart, they become two good lines that fail together.

Setting the evaluation weighting

Fix the criteria, weights and scoring method before bids arrive, publish them in the documents and do not move them afterwards. Four criteria cover most packaging tenders.

CriterionWhat it scoresEvidence to ask for
Delivered costPrice for your actual usage, including pack and pallet quantities, delivery charges, minimum orders and storageItemised schedule against your line list; delivery terms; basis for price reviews
Damage riskWhether the offered specification protects the product on your journeySpecification sheet per line; samples; trial results on live orders
Continuity of supplyAbility to keep supplying through peaks, a missed delivery or a material shortageLead times by line; stockholding and call-off offer; recovery plan
ServiceAccount management, specification support, sample turnaround, invoicing and reportingNamed contact; process for a specification change; reporting format

Delivered cost usually deserves the most weight of any single criterion, but rarely a majority. Packaging is a small part of the cost of the goods it carries, so a bid that is cheap on the invoice and slightly worse on damage can cost more than it saves. Score price on the total for your actual usage, not an average unit price, or a line you buy twice a year will outweigh the carton you buy by the pallet. A packaging review and cost reduction exercise gives a baseline, costing the current specification before it goes out to tender.

A tender that cannot tell a cheaper box from a weaker box will buy the weaker box.

Samples, trials and the like-for-like traps

Shortlisted bidders should sample every line where the specification is theirs, and every declared alternative. On bespoke and printed lines, approval of the sample is approval of the specification, so file it with the contract. Lines with real product risk then need a trial on live orders with a pass mark agreed in advance; our guide on how to run a packaging trial before you commit covers the set-up.

Where like-for-like quietly is not

  • Board. EB flute at around 4.0 to 4.5 mm and BC flute at 6.0 to 7.0 mm are both double wall, and they do not stack the same. Ask for flute and liner grade, not wall count.
  • Size. A carton quoted externally, or rounded from an imperial size, can be a few millimetres off and push parcels into the next carrier band.
  • Film. Pre-stretched hand wrap at 12 to 17 micron can match standard 17 to 23 micron wrap with less film, a genuine saving. Thinner standard film wrapped with more turns is not.
  • Foam. Matched on thickness at a lower density, it protects less.
  • Quantities. A lower unit price on a larger pallet quantity can mean more storage, or stock you cannot use before the design changes.

None of this makes the cheaper offer wrong. Sometimes the current specification is over-built and a lighter corrugated board grade does the job; a good bidder will say so. Test it before award rather than find out from the claims log.

Award and transition planning

Award is where the operational risk starts. A change of supplier touches every pack bench, reorder point and artwork file, so put the transition plan in the tender and score the responses. It should cover:

  • run-down of existing stock, especially printed lines, and who takes any remainder;
  • ownership and transfer of artwork, cutting forms and print plates;
  • a check of the first delivery of each line against the approved sample before it reaches the bench;
  • a short overlap with the outgoing supplier on critical lines;
  • an opening buffer, so the first reorders are deliveries rather than lead times.

Time the award inside the validity of the quotes; WSUK's own, for example, are valid for 30 days unless stated otherwise. Where printed run quantities exceed what your sites can hold, packaging stockholding with call-off keeps the economic run out of your racking. The bench-level side is covered in switching packaging supplier without disrupting despatch.

Send us your tender pack

Send the line list, usage and samples. We will specify each line in writing, price it against that specification, flag any line where a different grade would do the job and say plainly where your current specification is already right.

Frequently asked questions

What is the difference between an RFQ and an RFP for packaging?

An RFQ asks suppliers to price a specification you have already defined, so bids compare line by line. An RFP describes a requirement, such as a damage problem or a new retail outer, and asks suppliers to propose the specification as well as the price.

What should a packaging tender specification pack include?

A line list mapped to your SKUs, usage by line, internal dimensions, board grade and flute, tape construction, film gauge and application method, foam type and density, samples of the current pack, damage history and a delivery profile for each site.

How should packaging tender bids be weighted?

Set and publish the weights before bids arrive. Most packaging tenders score delivered cost, damage risk, continuity of supply and service. Delivered cost usually carries the most weight of any single criterion, but rarely enough to outvote damage risk and continuity combined.

Should a packaging tender accept alternative specifications?

Yes, if they are declared. Ask bidders to price your specification first and offer any alternative alongside it, with a specification sheet and a sample. A lighter grade can be the right answer, but it should pass a trial before award.

Do public sector packaging tenders follow different rules?

Public bodies must follow public procurement rules on how a contract is advertised, run, awarded and recorded. In England the Procurement Act 2023 came into force on 24 February 2025.

Related Articles

Freight
Choosing the Right Freight Mode: A Framework for UK Shippers
Air, sea or road? A practical decision framework for balancing cost, speed and reliability.
Freight
FCL vs LCL: Which Container Shipping Option Saves You Money?
Full vs shared containers explained — the break-even point most importers get wrong.
Freight
Road Freight to Europe: What UK Exporters Need to Know
Customs, documentation and transit times for post-Brexit European road freight.

Get a Packaging Quote

Tell us what you pack, how it travels and roughly what volumes, and we will specify it and quote against that specification.

View BrochureGet A QuoteGet A QuotePackaging enquiry
View BrochureGet A Quote